North Lockwood Boulevard Sidewalk Project

The Lockwood Boulevard sidewalks project includes the installation of 5-foot wide sidewalk from County Road 419 to County Road 426 along the east side of North Lockwood Boulevard. This project will provide for the completion of connectivity along the entire length on the east side of Lockwood Boulevard.

CM Engineering Services started construction on August 2017 and will be completed within 180 days.