In an effort to expand the City's existing reclaimed water infrastructure, a new reclaimed water main will be installed to connect with the existing reclaimed water main located south of the Oviedo Gymnasium and Aquatic Facility, run approximately 1,700 linear feet within the Oviedo Boulevard west right-of-way, then connect to an existing reclaimed water main south of East Broadway Street.
PROJECT TIMELINE
The project is currently in design.