The project will consist of a 12' wide trail to connect the sidewalk along the west side of Oviedo Boulevard to the east side of the sidewalk on Geneva Drive with continued connection to Solary Park.
The project will also include a mid-block traffic crossing on Geneva Drive to enable pedestrians to safely cross in the middle of the block rather than traveling to an intersection or crossing at an unpredictable mid-block location.
Project timeline
The project is currently in design.